THELIGHT at NATO Headquarters Brussels

THELIGHT

THELIGHT has been selected as the unique lighting provider to illuminate the Main Conference Hall at NATO Headquarters in Brussels. The Main Conference Hall is where the “Family portrait” of the NATO Ministers of Defense takes place regularly and since April 2013 is the first illuminated exclusively using LED technology.

The technical department needed to replace the old arrays of 2500W HMI units hanging from the ceiling to light from 8 meters away the 9 by 4 meters podium were the NATO Ministers and officers pose for the international television and press cameras.

A high color rendering index as well as a non-disturbing and soft light was an essential requirement while the goal was a reduction in the operational cost and a simplified maintenance.

Project requirements

–       Simplify the installation with no ballast or separate power supply

–       Instant start and remote dimming

–       Reduce maintenance to avoid replacing lamps and gels

–       Reduce electric power consumption

–       Homogeneous shadow-less light 600 Lux at 8 meters distance

–       High CRI to get perfect skin tones using both HD and photo cameras

THELIGHT products installed

4LONG-STUDIO

http://www.thelight.com.es/Html/Onboard-4longstudio-UK.php

Custom provided mount “Yoke 2x 4LONG-STUDIO vertical”

Special yoke to mount vertically 2x 4LONG-STUDIO fixtures so that both can be tilted and individually adjusted to light the requested area

The HMI fixtures required regular maintenance replacing lamps and gels and its long time ignition produce some difficulties on the NATO Ministers tight schedule.

The old 2500W HMI lights has been completely replaced by arrays of 4LONGSTUDIO fixtures hanging from the ceiling.

THELIGHT has supplied a custom solution combing arrays of two 4LONG-STUDIO high-power LED panels on a single yoke so that both fixtures can be individually adjusted to evenly light the podium area.

To get the requested soft, shadow-less, non-disturbing light THELIGHT fixtures have been displayed in three separate groups of two 4LONG-STUDIO units with Hilite softbox diffusers on them.

The compact 4LONG-STUDIO fixtures include power supply and control on-board making the installation on the hall ceiling extremely simple with no external ballast or dimmer rack required. Simple power and DMX cables have been set up.

Once installed the LED lights can be instantly switched on and adjusted changing light output, color temperature or green/magenta correction, THELIGHT high-power LED lights require no maintenance and operate in total silence with no fans to be serviced, lamps or gels to be replaced.

THELIGHT solution consumes 8 times less than the old HMI lights dramatically reducing the electric power cost. The total power draw is now only 900 Watts.


Tags assigned to this article:
THELIGHT

Related Articles

Barco Silex’ FIPS-compliant DRBG IP integrated in innovative short-range wireless ICs of Dialog Semiconductors

    Barco Silex announced that Dialog Semiconductor successfully integrated the Barco Silex BA431 IP core into its short range

GatesAir Accelerates TV Channel Relocation for Oregon Broadcaster

    GatesAir has helped relocate KOHD-TV of Bend, Oregon to a new UHF channel assignment following the station’s agreement

Advantech Wireless wins key SATCOM Infrastructure Award to Construct Brazil’s Broadband Access Initiative

      Advantech Wireless has received an order for Ka-Band hub facilities from Telebras, the Brazil telecommunications infrastructure company,